The MX3D bridge is going to be tested at the University of Twente.

The MX3D bridge is going to be tested at the University of Twente. They will test the Bridge under a 20 ton load. Imperial College London has the lead for  the testing which will take approximately one month. After that, the Bridge will stay for another two months at the University’s Campus in Twente to install and test the smart sensor system under the bridge.